Back to SiteTicket AI

Remote jobs

No walkthrough, no pointing at the wall. The photo has to do that work.

Half the jobs where extra work turns up are jobs where nobody is standing next to you. A rental between tenants, a house being sold, a commercial space whose owner is three states away. You cannot point at the problem, so the customer is approving a description rather than a thing they can see - and a description is exactly what people later remember differently.

Direct answer

Send a photo of the actual problem, one plain sentence describing it, the price, and a yes or no question - all in the same message. A picture removes the ambiguity that a remote description leaves behind, and it is the single biggest difference between a remote approval that holds and one that gets argued about.

01Workflow

The remote approval message

  1. 1

    Photograph the actual condition, close enough to see and wide enough to place it.

  2. 2

    Describe it in one sentence a non-tradesperson can picture.

  3. 3

    State the price, and say plainly that it is outside the original quote.

  4. 4

    Ask a yes or no question rather than inviting a discussion.

  5. 5

    Say what happens while you wait, so silence does not become a decision.

02Practical notes

What matters in the field.

The photo replaces the walkthrough.

On site you would turn the customer around and point. Remotely, the photo is the only version of that available, and without it you are asking someone to authorise money for something they are imagining. A single clear image converts most of the hesitation that a text-only description produces.

Say what you will do while you wait.

The dangerous gap on remote jobs is the hour between sending the price and getting an answer. State it explicitly: continuing with the original scope, or stopping at a specific point. Otherwise the customer assumes work is paused and you assume it is fine to continue, and both of you are wrong.

Silence is not permission, especially at distance.

Remote customers are frequently busy or in a different time zone, so no answer is common and means nothing. Contractors who read it as tacit approval are the ones who end up doing unapproved work on the customer who is hardest to argue with later, because there was never a face-to-face conversation to remember.

Rentals and sales have someone else's clock running.

An empty rental is costing the owner money every day and a house under contract has a closing date. That urgency works in your favour if you present the options with timing attached, and against you if you assume the owner will accept a delay because they are not there to see it.

The record matters more, not less, without a walkthrough.

When there was no conversation on site, the message thread is the entire history of what was agreed. Keep the photo, the price, and the reply together, and file them with the job. On remote work, that thread is often the only evidence either side has.

03Checklist

Before you send it

A photo of the actual condition, clear and in context

One sentence a non-tradesperson can picture

A specific price, stated as outside the original quote

A yes or no question at the end

What you are doing while you wait, stated explicitly

The photo, price, and reply kept together with the job record

Example

The message that works remotely

Opened up under the sink and found the shutoff is seized and weeping - photo attached.

Replacing it is $140 including the valve. That's outside the original quote for the faucet swap.

Want me to go ahead? I'll carry on with the faucet in the meantime and hold off on this until I hear back.

04FAQ

Common questions.

What if they never reply and I am losing the day?

Call once, then decide against your own rule rather than in the moment. Many contractors finish the original scope, leave the extra undone, and send a short note recording that the request was sent and not answered. That protects you far better than proceeding and hoping the invoice goes unchallenged.

Can I send one message covering several discovered items?

Only if each item has its own photo and price and the customer can approve them separately. A bundled total encourages a bundled refusal. Individually priced items let them say yes to two and no to one, which usually means more approved work, not less.

The property manager approves but the owner pays. Whose yes counts?

Ask at the quote which of them authorises additional costs, and up to what amount. Property managers frequently have a spending limit above which the owner has to sign off, and that limit is rarely mentioned unless you ask.

See what the approval record looks like.

Open the sample PDF first, then download SiteTicket AI if this is close to how you handle added work, customer approval, and invoice backup.

Related guides